Newsletter
The Ministry of Economic Affairs of Taiwan announced the feed-in-tariff for renewable energy projects for 2020
Below please find the 2020 FiT for solar energy facilities:
Classification |
Installed Capacity |
2020 Feed-in-Tariff (NT$/kWh) |
Fees for module recycling (NT$/kWh) |
Fees for connecting to ultra-high voltage grid (NT$/kWh) |
||
Phase 1 |
Phase 2 |
|||||
Roof-top |
1 kWh or more but less than 20 kWh |
5.7132 |
5.7132 |
0.0656 |
- |
|
20 kWh or more but less than 100 kWh |
4.4366 |
4.3701 |
- |
|||
100 kWh or more but less than 500 kWh |
4.1372 |
4.0722 |
- |
|||
500 kWh or more |
not connected to ultra-high voltage grid |
4.0571 |
3.9917 |
- |
||
connected to ultra-high voltage grid |
0.4674 |
|||||
Ground-mounted |
1 kWh or more |
not connected to ultra-high voltage grid |
3.9383 |
3.8752 |
- |
|
connected to ultra-high voltage grid |
0.4506 |
|||||
Floating |
1 kWh or more |
not connected to ultra-high voltage grid |
4.3319 |
4.2709 |
- |
|
connected to ultra-high voltage grid |
0.4358 |
|||||
Note: Phase 1 FiT applies during January 1 to June 30, 2020; Phase 2 FiT applies during July 1 to December 31, 2020. |